I want to show the progress of the MAPS RV project by showing beforehand after pictures up to the time we left. The project was to take an existing building and make 6 dorm rooms for the college students of Trinity Church and their satellite campus of Southeastern University.
Here are the before and after pics.
Hall way leading to three of the rooms.
Six rooms ready for paint then carpet.
Joyce and Georgie -- primer team.
Also, new kitchen counter tops were installed and two extra cabinets installed. Don't know why I couldn't find my before and after pics
---------------
There is a small house next door that was renovated for house parents.
The old sheet rock was removed and some supporting beams replaced due to mold from water damage.
A portion of the wall was removed for an open concept between what will be the kitchen and living room area.
The week before we left, insulation was installed.
Sheet rock was going up and muddying was probably completed when we left.
We really enjoyed this project and made lasting MAPS RV friends.