Sunday, November 10, 2013

First Week Progress --The Church of Garden Valley (TCOGV)

This is our first full week at TCOGV.

Here is a picture of the church buildings. 

The building on the far right is building three.  Glenn is working in that building. The project is to make Sunday School rooms on the bottom level and build an upper level for the youth. 

The building in the middle is used as the sanctuary.  Called building two.

The building on the left of page is building one and presently used for storage. 

Here is inside of building one.  Or at lease one half of the building. 



This large roll up door will be closed in with a wall. 

Studs for the wall. 

This part of the building will have a lower level for class rooms with a hallway in between and rooms on each side. The top level will be built for the youth room. 

This is only half or less actually of the building. 

The room in the pictures are to the right of this hallway. On the left is another large room that has a swimming pool. 



Lumber for the project. And another view of the room. 


These buildings were one used as a boat manufacturing business. 

There is a lot going on here. I hope to keep up with the progress in this blog.  We are here for the month of November. 

1 comment:

  1. thanks for the update and look forward to more to come .. enjoy your time there

    ReplyDelete